Ontario
Hydro (1994-1995); conducted detailed aquatic-biology and hydrology
studies as part of Ontario Hydro's environmental assessment for the
re-development of the Ear Falls Hydroelectric Generating Station located
in northwestern Ontario
Ontario
Hydro (1990-1992, 1995); conducted environmental monitoring studies
at the Darlington Nuclear Generating Station; these projects included
sediment surveys, fisheries monitoring, water sampling, larval-fish
collections, underwater video recordings of the study area, zebra-mussel
surveillance, larval-fish studies, and ROV surveys of fish behaviour
Ontario
Ministry of the Environment (1990); completed an environmental assessment
of the lower Welland River; included evaluation of water and sediment
quality, flow, and aquatic macrophytes, along with an overview of fish
communities
City
of Mississauga (1990); prepared an Environmental Studies Report
as part of the Class Environmental Assessment of the proposed shoreline-stabilization
and beach improvements for the Jack Darling Park in Mississauga
Metropolitan
Toronto and Region Conservation Authority (1989); participated in
the environmental assessment of a waterfront park at East Point on the
shore of Lake Ontario as proposed by MTRCA
Ontario
Ministry of the Environment (1988); evaluated temporal changes in
the macrophyte, benthic, and epiphytic communities at sites in Severn
Sound since the construction of two water pollution control plants (WPCPs);
included the identification of impacts of the WPCPs and the evaluation
of various implications regarding water quality
The
PolarGas Project (TransCanada Pipelines Limited) (1983, 1984); prepared,
edited, and reviewed environmental-assessment documents for a proposed
pipeline; completed an aerial environmental reconnaissance of a proposed
pipeline route in Alberta and the Northwest Territories
|